It was a real 'mad house' here on Monday, the facia guys turned up first to 'crack on' and get the guttering finished, then the guys turned up to spray the foam, but they had to hang around for about an hour before starting as the other guys were still working on where the others wanted to run the hose in :(
They started about 10.30 and estimated about 5 hours to spray the foam - they told us afterwards that the area of our roof space is LARGER than a normal semi.
Then the facia guys discovered that they hadn't been given enough brackets for the guttering
:( They reckoned that the surveyor estimated for brackets to go every metre and not 800mm as they should be so they only got three sides done before they had to leave and get some more - the local supplier only had white NOT black.
The foam guys left about 2pm and the others then returned about for about 10 minutes to finish the last side.
Rubbish got collected on Tuesday, when we discovered that part of the lounge ceiling had been dented :( - they couldn't see what could have done it but later investigation by our builder discovered that there was a long length of twisted pipe up in the roof space that could have slipped between the beams and 'poked' a hole in the ceiling.
Our builder did his usual two days (thursday and Friday) and made a start on our main bedroom which is currently unusable for anything other than storage.
Yesterday he got the fitted wardrobes out and decommissioned an old 'built in' electric heater and we could see the full extend of what needed to be done - not too bad. Today he came back and stripped all the old paper off and made good - also sealed an old vent that is now 'defunct'. Then on his two days next week he will decorate using some odd rolls of paper that I have and paint so that we can move in there and hopefully GOM will have more room to get his w/chair nearer to the bed.
Glazing has been lined up for after the first week of July, so hopefully in the intervening weeks we can get the new loft hatch sorted and the rewiring and new pipework for the radiators planned.
Hoping to have my parents to stay for the Fathers' day weekend as our residents association is having their summer party where we can invite family - it may also be a prequal for my BIG Birthday in July :O